Technical reports

Print Print page   Download PDF PDF image

Adding capacity at Heathrow Airport Please note: this consultation closed on 27 February 2008.

Heathrow: Runway 3 study (4 Mb)

Technical report by NATS.

Published:
22 November 2007

Heathrow: Runway 3 - Capacity (376 kb)

Technical report by NATS.

Published:
22 November 2007

Heathrow: Runway 3 - Summary of 27 options analysis (240 kb)

Technical report by NATS.

Published:
22 November 2007

Heathrow mixed mode: Concept of operations (560 kb)

Technical report by NATS.

Published:
22 November 2007

Heathrow mixed mode: Capacity (219 kb)

Technical report by NATS.

Published:
22 November 2007

Heathrow mixed mode: Scenarios (417 kb)

Technical report by NATS.

Published:
22 November 2007

Revised future aircraft noise exposure estimates for Heathrow airport

Technical report by CAA Environmental Research and Consultancy Department.


Revised emissions methodology for Heathrow (863 kb)

Technical report by AEA Energy and Environment.

Published:
22 November 2007

Emissions methodology for future London Heathrow (LHR) scenarios (425 kb)

Technical report by AEA Energy and Environment.

Published:
22 November 2007

Heathrow airport emission summaries (573 kb)

Technical report by AEA Energy and Environment.

Published:
22 November 2007

Air Quality Studies for Heathrow (39 Mb)

Technical report by Cambridge Environmental Research Consultants. NB Please note this is a large file which takes time to download. You may find it easier to right click on the link and select Save Target As (IE only).

Published:
22 November 2007

Population exposure to air pollution (3 Mb)

Technical report by Atkins.

Published:
22 November 2007

Demonstrating confidence in the PSDH air quality work (1 Mb)

Technical report by Atkins.

Published:
22 November 2007

Surface access report (4 Mb)

Technical report by BAA Heathrow.

Published:
22 November 2007

Consultations