Technical reports
Please note: this consultation closed on 27 February 2008.
Heathrow: Runway 3 study (4 Mb)
Technical report by NATS.
- Published:
- 22 November 2007
Heathrow: Runway 3 - Capacity (376 kb)
Technical report by NATS.
- Published:
- 22 November 2007
Heathrow: Runway 3 - Summary of 27 options analysis (240 kb)
Technical report by NATS.
- Published:
- 22 November 2007
Heathrow mixed mode: Concept of operations (560 kb)
Technical report by NATS.
- Published:
- 22 November 2007
Heathrow mixed mode: Capacity (219 kb)
Technical report by NATS.
- Published:
- 22 November 2007
Heathrow mixed mode: Scenarios (417 kb)
Technical report by NATS.
- Published:
- 22 November 2007
Revised future aircraft noise exposure estimates for Heathrow airport
Technical report by CAA Environmental Research and Consultancy Department.
Revised emissions methodology for Heathrow (863 kb)
Technical report by AEA Energy and Environment.
- Published:
- 22 November 2007
Emissions methodology for future London Heathrow (LHR) scenarios (425 kb)
Technical report by AEA Energy and Environment.
- Published:
- 22 November 2007
Heathrow airport emission summaries (573 kb)
Technical report by AEA Energy and Environment.
- Published:
- 22 November 2007
Air Quality Studies for Heathrow (39 Mb)
Technical report by Cambridge Environmental Research Consultants. NB Please note this is a large file which takes time to download. You may find it easier to right click on the link and select Save Target As (IE only).
- Published:
- 22 November 2007
Population exposure to air pollution (3 Mb)
Technical report by Atkins.
- Published:
- 22 November 2007
Demonstrating confidence in the PSDH air quality work (1 Mb)
Technical report by Atkins.
- Published:
- 22 November 2007
Surface access report (4 Mb)
Technical report by BAA Heathrow.
- Published:
- 22 November 2007

